Subpanel · Instant Price

Subpanel Installation Instant Price

Answer a few quick questions and see your estimated price for a new subpanel right away. No scheduling or payment needed.

Step 1 of 9

What size subpanel do you need?

Not sure? 100A fits most garages and ADUs. We’ll confirm the right size with a load check.

Where will the subpanel go?
How far is the subpanel from your main panel?

Measure the path the feeder would take. The first 25 ft are included.

Will the feeder need to run underground?

Underground runs add $50 per foot of trench.

About how many feet of that run is underground?

Only the part that goes underground. It can’t be longer than the total distance. Trenching price depends on soil conditions and is confirmed at the site visit.

What size is your main panel?

Read the number on the main breaker (usually the largest breaker, at the top).

Do you want a permit pulled?

Your instant estimate

Calculating…

Included

  • New subpanel at the size quoted
  • Feeder wire and the feeder breaker in your main panel
  • Grounding (ground rods and a disconnect for detached buildings)
  • Electrical permit and inspection (only if you selected it)

Estimate includes the subpanel, feeder and feeder breaker, and grounding; trenching and permit included only if selected. Final pricing is subject to site inspection and a load check. Main panel upgrades, SDG&E work, concrete cutting or boring, and landscape repair are not included unless specifically agreed upon.

Where should we send your estimate?

Your info, plus 5 quick photos: your main panel and its label, the subpanel spot, the path between, and your meter.

Photos

Photos help us confirm your price. Use your phone camera or pick from your photo library (JPG, PNG, HEIC or WebP).

Photo of your main panel, door open *

Close enough to see the breakers.

Photo of the main breaker or panel label *

The number on the main breaker, or the label inside the door.

Photo of where the subpanel goes *

The wall or spot for the new subpanel.

Photo of the path between them *

A wide shot showing the route from the main panel.

Photo of your electric meter *

The SDG&E meter, close enough to read.

Extra photos (optional, up to 3)

Anything else that helps.

We’ll only use your info to follow up on this request. No scheduling or payment happens here.

Questions? Use our contact form or get a main panel upgrade price.